BK, AR, DOP, GP
*for approval, signatures of the architect are required, updating of parts of the additional documentation and state regulations for a specific land plot).
BK, AR, DOP, GP with updating for a specific land plot.
BK, AR, DOP, GP with updating for a specific land plot, changes to the architectural part
*no changes in structures, that is, only non-load-bearing structures).
BK, AR, DOP, GP with updating for a specific land plot, changes in architecture and structures
*with a restriction on changing the building area of no more than 20m2.
BK, AR, DOP, GP with updating for a specific land plot, changes in architecture and structures
*with a restriction on changing the building area of no more than 100 m2 and without changes to technical solutions).
BK, AR, DOP, GP with updating for a specific land plot, changes in architecture and structures
*changing no more than 40% of technical and architectural solutions.